After 500+ Toronto and GTA projects, we have a clear understanding of how to deliver a better construction experience.
- Thorough site setup. Floor and stair protection installed, dust containment rigged, bins delivered, permits posted on site, demolition starts.
- Daily site supervisor on every job. They check material deliveries against the spec sheet, sign off rough-in inspections, and post photo progress to your client portal that evening.
- Weekly schedule review. Every Friday your PM sends a written progress note, flags next-week dependencies (engineer letters, inspection slots, long-lead materials), and updates the timeline.
- 48-hour change-order rule. Any addition or change is costed, scheduled, and documented within 48 hours. Nothing happens without a signed change order — your budget and the timeline are both protected.
- Internal QC before your walkthrough. Your PM runs a punch-list walkthrough first, fixes what they find, then schedules your handover.
- Final walkthrough and closeout. You walk every room with your PM. Closeout package handed over: permit numbers, ESA certificate, TSSA certificate, manufacturer warranty registrations, as-built drawings.